Cloud Migration Services — AWS, Azure & GCP

Cloud migration services: zero-downtime moves to AWS, Azure and Google Cloud with data integrity, security and cost optimization. Senior DevOps team, Kosovo.

What you get

We move applications and data to AWS, Azure or Google Cloud with a tested plan: inventory, target architecture, staged cut-over and validation, so you get the cost and reliability benefits without surprises on migration day.

Deliverables

  • Application and dependency inventory
  • Target cloud architecture and landing zone
  • Staged migration and cut-over plan
  • Data migration with integrity checks
  • Post-migration cost optimization

Technologies we use

  • AWS
  • Microsoft Azure
  • Google Cloud
  • Terraform
  • Docker
  • Kubernetes
  • AWS DMS
  • PostgreSQL

Typical engagements

2–3 weeks

Migration readiness

Inventory, risks, cost model and recommended approach.

1–3 months

Lift and optimize

Move workloads, then right-size and harden them.

3–6 months

Re-platform to cloud-native

Containers, managed databases and serverless where it pays off.

How a cloud migration runs with us

A cloud migration is mostly discovery and rehearsal; the move itself should be the uneventful part. Each stage below ends with a go or no-go before the next one starts.

  1. 01

    Discovery and dependency mapping

    We inventory servers, databases, queues, scheduled tasks, certificates and hard-coded IP addresses, then map which applications talk to which. Every workload gets a strategy: rehost, re-platform, refactor, replace or retire. You receive the inventory, a cost model for the target cloud and a proposed sequence of migration waves.

  2. 02

    Landing zone in your own account

    Before any workload moves, we build the foundation with Terraform in your AWS or Google Cloud organisation: separate accounts or projects per environment, networking, a VPN or private link to your data centre, identity and access, central logging and budget alerts. You approve the landing zone design, and every later wave is deployed into it.

  3. 03

    Wave planning and rehearsals

    Workloads are grouped into waves, starting with one that carries little risk but still exercises the whole path. Each wave is rehearsed end to end against a staging copy: data sync, application start-up, DNS switch and rollback. The timings measured in rehearsal set the length of the real cut-over window, which the business signs off.

  4. 04

    Cut-over

    Databases replicate continuously until the agreed window. Then writes stop, the final changes sync, checksums and row counts are compared, and traffic moves through DNS records with lowered TTLs or a switch at the load balancer. If any check fails, we execute the rollback rehearsed earlier instead of improvising one at night.

  5. 05

    Hypercare, right-sizing and decommissioning

    After each wave we watch error rates, latency and the bill, adjust instance sizes, storage classes and autoscaling, and fix anything the move exposed. Once the business confirms the old environment is no longer needed, its servers and licences are shut down. That is the point where the savings actually begin.

What drives the cost of cloud migration services

We price migration work by the engineer-hour at €45–65; larger estates with many waves usually run as a dedicated squad from €15k per month. AWS or Google Cloud bill your consumption directly, separately from our work.

Number and variety of workloads
A fleet of near-identical web servers costs far less to move than a handful of applications that each have their own runtime, operating system version and deployment habits. Grouping similar workloads into the same wave lets one tested runbook cover many moves.
Migration strategy per workload
Rehosting a virtual machine as it is takes the least effort now. Re-platforming onto managed databases or containers costs more during the project and less to run afterwards. Deciding workload by workload, instead of one rule for the whole estate, puts refactoring effort only where the running-cost return justifies it.
Data volume and tolerated downtime
Large databases, big file stores and strict downtime limits call for continuous replication, change data capture and repeated rehearsals. If the business can accept a short maintenance window overnight or at a weekend, a simpler dump-and-restore approach may be enough and is noticeably cheaper.
Licences and hardware-bound dependencies
Commercial databases, per-core licences, Windows workloads and appliances tied to hardware keys may not move unchanged. Working out licence terms in the cloud, or replacing the component, becomes part of the scope. Bringing your licence agreements to discovery avoids redesign later.
Compliance and network requirements
Data residency in an EU region, private connectivity to systems that stay on premises, encryption key management and audit logging all add design and testing work. Stating them before the landing zone is built costs far less than retrofitting them once workloads are live.

Questions to ask a cloud migration services company

Most migration trouble comes from dependencies nobody listed and rollbacks nobody tested. Ask any provider, including us, how they deal with both.

How will you find dependencies we do not know about?
A good answer combines conversations with your team and hard evidence: network flow logs, connection tables on database servers, crontab entries and configuration files scanned for hostnames. Discovery based only on a spreadsheet you provide misses the forgotten integration that breaks on cut-over night.
Have you rehearsed the rollback, and how long does it take?
Rollback should be rehearsed just like the migration, with a measured duration and a clearly defined point of no return. Also ask what happens to data written in the new environment if you have to go back to the old one.
Which workloads would you not move as they are?
An honest provider names the workloads to re-platform, replace or retire, and says when a workload is better left where it is. A plan that rehosts everything unchanged is quick, but it tends to carry existing inefficiencies into a larger monthly bill.
What will our monthly cloud bill look like after the move?
Expect an estimate per environment built from measured utilisation rather than today’s server sizes, with the assumptions written down. It should also include data egress, backups, logging volume and support plans, which first estimates commonly leave out.
Whose accounts will everything live in?
The landing zone, infrastructure code, state files and credentials belong in your cloud organisation and your repository from day one. A provider who builds in its own account and hands over later creates a dependency, and eventually a second, riskier migration.

Why companies choose elitics

The questions your legal, security and finance teams will ask, answered before the first line of code.

Intellectual property
NDA and IP assignment are signed before work starts. You own all code, designs and documentation.
Your environment
Engineers work in your repositories, ticketing and communication tools, under your access policies.
Quality controls
Code review on every change, automated tests and CI/CD on every project.
Visibility
Weekly sprint demos and progress reports, with a named lead accountable for delivery.
Continuity
If an engineer is not the right fit, we replace them at no extra cost.
Flexibility
Scale the team up or down month to month as your roadmap changes.

Common questions

Which cloud should we move to?

We compare AWS, Azure and Google Cloud against your workloads, team skills and existing contracts, and recommend one with a cost estimate.

How do you avoid data loss during migration?

With rehearsed migrations, checksums and row-count validation, and a rollback plan for every cut-over step.

Will our costs go down after migrating?

Often, but not automatically. We include a right-sizing phase after the move, which is where most of the savings come from.

Do you offer AWS migration services?

Yes. Our cloud migration services cover AWS and Google Cloud, with the landing zone defined in Terraform inside your own organisation. On AWS that typically means a multi-account structure, VPC networking, centralised identity and managed services such as RDS where they suit the workload. The target services follow your workloads and existing commitments, not a preference for one catalogue.

Can our developers keep shipping during the migration?

Yes, with some coordination. A change freeze applies only to the components in the current wave, and only around its cut-over window. As each wave lands, the CI/CD pipelines are pointed at the new environment, so developers deploy to the cloud from then on without changing how they work day to day.

What happens to our old servers and hosting contracts?

Old servers stay on standby or read-only until the business confirms everything works in the cloud, then they are wiped and switched off. During discovery we list the hardware, licences and hosting contracts that can end and when, so notice periods line up with the migration plan instead of overlapping it for months.

Let’s build what comes next.

Tell us what you need to build or scale. You will get a proposal and estimate within 24 hours.

Or write to us directly

hello@elitics.io+383 49 171 069

Dukagjini Center, Prishtina, Kosovo