Legacy Application Modernization Services

Modernize legacy software without stopping the business: monolith to microservices, stack upgrades and cloud-native re-architecture. Senior team, from €45/h.

What you get

We modernize old systems that are slow, risky or expensive to change: breaking monoliths into services, upgrading outdated .NET, Java or PHP stacks, and moving to the cloud step by step, so the business keeps running throughout.

Deliverables

  • Legacy system assessment and risk map
  • Target architecture and migration plan
  • Incremental rewrite (strangler pattern)
  • Data migration with validation
  • Automated tests around critical flows

Technologies we use

  • .NET
  • Java
  • PHP
  • Node.js
  • Microservices
  • Docker
  • Kubernetes
  • PostgreSQL
  • AWS

Typical engagements

2–4 weeks

Modernization assessment

What to keep, refactor or replace, with cost and risk.

2–4 months

Stack upgrade

Move to supported framework and runtime versions.

4–9 months

Monolith to services

Gradual extraction of modules behind stable interfaces.

How a legacy modernization project runs with us

We change old software while it keeps serving customers. Every step below ends with something running in production, not a promise about a future rewrite.

  1. 01

    Map the system as it really behaves

    We trace requests through the code, read the database schema and list the cron tasks, integrations and reports that finance or operations rely on. We also check which modules change most often. You get a system map and a keep, refactor or replace verdict per module, and choose the first slice to modernize.

  2. 02

    Pin down current behaviour with tests

    Before changing a line, we write characterisation tests around the flows that earn money or carry legal weight: invoicing, pricing rules, permissions. Where code cannot be tested in isolation, we record production traffic and compare outputs. From then on, regressions surface in CI instead of in support tickets, and the team signs off the baseline.

  3. 03

    Put a seam in front of the old code

    A routing layer, API facade or anti-corruption layer goes between callers and the legacy module, so old and new implementations can sit side by side. Feature flags decide which one serves a given customer. The decision made here is the order of extraction, ranked by business value and by how tangled each module is.

  4. 04

    Replace one slice at a time

    Each slice is rebuilt on a supported stack, for example current .NET in place of .NET Framework, or a TypeScript service in place of a PHP module. It runs in shadow mode beside the old code, outputs are compared, and customers switch over in groups. The retired code for that slice is deleted, not kept as a fallback forever.

  5. 05

    Retire the leftovers and hand over

    When the last caller stops using a legacy component, we remove it together with its tables, scheduled tasks and servers, and update the runbooks. Your team receives architecture decision records, a routine for keeping dependencies current and a written list of the debt we deliberately left, so the system does not drift back to where it started.

What drives the cost of legacy application modernization

Modernization is billed by the engineer-hour at €45–65, or as a dedicated squad from €15k per month when the programme runs over several quarters. The factors below decide how many hours it takes.

How much behaviour nobody wrote down
Business rules buried in stored procedures, database triggers and very large classes have to be found before they can be preserved, and each one discovered late means rework. Early sessions with the people who use the system every day are the cheapest way to bring them to the surface.
Test coverage on day one
A codebase without automated tests needs a safety net before refactoring starts, and building that net is real work. Systems that already have tests around billing and access control move faster. Spending on characterisation tests first lowers the cost of every slice that follows.
Coupling through the database
When many modules read and write the same tables, no slice can move until data ownership is untangled. Shared schemas, joins across modules and logic living inside the database are often the largest single item in the estimate. Splitting ownership table by table keeps the work incremental.
Integrations and file exchanges
Old systems often talk to partners through SFTP drops, fixed-width files, SOAP endpoints or direct database links. Each one must keep working through the transition, frequently with an adapter in between. A complete list of integrations at the start prevents expensive surprises halfway through.
Running old and new side by side
Shadow runs, dual writes and feature flags cost effort and some temporary infrastructure, but they are what make a rollback possible. The overlap stays short when customers are switched in groups, slice by slice, instead of waiting until the whole system is rebuilt.

Questions to ask a legacy application modernization services provider

Modernization projects rarely fail on code quality. They fail on sequencing, and on behaviour that nobody documented. These questions test a vendor on both.

Which part would you modernize first, and why that one?
A good answer ties the first slice to a concrete pain, such as slow releases or a component that has lost vendor support, and keeps it small enough to reach production quickly. A vendor whose first deliverable is a plan for a complete rewrite has not looked closely enough.
How will you capture behaviour that is not documented?
Look for characterisation tests, recorded traffic, side-by-side comparison of old and new outputs, and structured sessions with long-standing users. Reading the code alone misses rules that live in configuration tables, scheduled tasks and the manual workarounds staff have built up.
How do we roll back a slice that misbehaves?
The answer should name the mechanism, such as a feature flag, a routing switch or keeping the old path warm for a set period, and explain how data written by the new code is reconciled afterwards. "We test thoroughly" is not a rollback plan.
What happens to the data model?
Modernizing the code while leaving a tangled schema only moves the problem. Ask how table ownership will be divided, how schema migrations run without locking busy production tables, and how reports built on the old structure will keep working.
When does the old system get switched off?
Modernization pays off only when legacy components are actually removed. A credible vendor sets decommissioning criteria for each component and budgets time for deleting old code, batch scripts and servers, rather than leaving you with two systems to maintain.

Why companies choose elitics

The questions your legal, security and finance teams will ask, answered before the first line of code.

Intellectual property
NDA and IP assignment are signed before work starts. You own all code, designs and documentation.
Your environment
Engineers work in your repositories, ticketing and communication tools, under your access policies.
Quality controls
Code review on every change, automated tests and CI/CD on every project.
Visibility
Weekly sprint demos and progress reports, with a named lead accountable for delivery.
Continuity
If an engineer is not the right fit, we replace them at no extra cost.
Flexibility
Scale the team up or down month to month as your roadmap changes.

Further reading

Common questions

Do we have to rewrite everything?

Rarely. We usually replace the system piece by piece behind the existing interfaces, so value arrives early and risk stays low.

Will there be downtime?

We plan migrations to avoid it, using parallel runs, feature flags and staged data migration with rollback options.

Can you work with old, undocumented code?

Yes. We start by mapping the system and adding tests around critical behavior before changing it.

Is legacy modernization the same as cloud migration?

No. Modernization changes the application itself: its code, framework, architecture and data model. Cloud migration moves workloads to a different hosting environment, sometimes without touching the code at all. The two often meet, but a modernized system can stay on your own servers, and a migrated one can still be legacy underneath. We scope them separately so each budget stays clear.

Can modernization run alongside new feature work?

Yes, and it usually should. We agree how capacity is split between modernization slices and roadmap features, and we route new features into the parts already modernized wherever possible, so nothing gets built twice. Product owners see both streams on one board and can shift the balance at each sprint planning.

How should we budget for legacy application modernization services?

Budget phase by phase rather than for the whole programme at once. The modernization assessment takes two to four weeks and ends with a sequenced plan and an estimate per slice. After that, work runs at €45–65 per engineer-hour or with a dedicated squad from €15k per month, and you can pause between slices without losing what is already in production.

Let’s build what comes next.

Tell us what you need to build or scale. You will get a proposal and estimate within 24 hours.

Or write to us directly

hello@elitics.io+383 49 171 069

Dukagjini Center, Prishtina, Kosovo