2–4 weeks
Modernization assessment
What to keep, refactor or replace, with cost and risk.
Modernize legacy software without stopping the business: monolith to microservices, stack upgrades and cloud-native re-architecture. Senior team, from €45/h.

We modernize old systems that are slow, risky or expensive to change: breaking monoliths into services, upgrading outdated .NET, Java or PHP stacks, and moving to the cloud step by step, so the business keeps running throughout.
2–4 weeks
What to keep, refactor or replace, with cost and risk.
2–4 months
Move to supported framework and runtime versions.
4–9 months
Gradual extraction of modules behind stable interfaces.
We change old software while it keeps serving customers. Every step below ends with something running in production, not a promise about a future rewrite.
01
We trace requests through the code, read the database schema and list the cron tasks, integrations and reports that finance or operations rely on. We also check which modules change most often. You get a system map and a keep, refactor or replace verdict per module, and choose the first slice to modernize.
02
Before changing a line, we write characterisation tests around the flows that earn money or carry legal weight: invoicing, pricing rules, permissions. Where code cannot be tested in isolation, we record production traffic and compare outputs. From then on, regressions surface in CI instead of in support tickets, and the team signs off the baseline.
03
A routing layer, API facade or anti-corruption layer goes between callers and the legacy module, so old and new implementations can sit side by side. Feature flags decide which one serves a given customer. The decision made here is the order of extraction, ranked by business value and by how tangled each module is.
04
Each slice is rebuilt on a supported stack, for example current .NET in place of .NET Framework, or a TypeScript service in place of a PHP module. It runs in shadow mode beside the old code, outputs are compared, and customers switch over in groups. The retired code for that slice is deleted, not kept as a fallback forever.
05
When the last caller stops using a legacy component, we remove it together with its tables, scheduled tasks and servers, and update the runbooks. Your team receives architecture decision records, a routine for keeping dependencies current and a written list of the debt we deliberately left, so the system does not drift back to where it started.
Modernization is billed by the engineer-hour at €45–65, or as a dedicated squad from €15k per month when the programme runs over several quarters. The factors below decide how many hours it takes.
Modernization projects rarely fail on code quality. They fail on sequencing, and on behaviour that nobody documented. These questions test a vendor on both.
The questions your legal, security and finance teams will ask, answered before the first line of code.
Rarely. We usually replace the system piece by piece behind the existing interfaces, so value arrives early and risk stays low.
We plan migrations to avoid it, using parallel runs, feature flags and staged data migration with rollback options.
Yes. We start by mapping the system and adding tests around critical behavior before changing it.
No. Modernization changes the application itself: its code, framework, architecture and data model. Cloud migration moves workloads to a different hosting environment, sometimes without touching the code at all. The two often meet, but a modernized system can stay on your own servers, and a migrated one can still be legacy underneath. We scope them separately so each budget stays clear.
Yes, and it usually should. We agree how capacity is split between modernization slices and roadmap features, and we route new features into the parts already modernized wherever possible, so nothing gets built twice. Product owners see both streams on one board and can shift the balance at each sprint planning.
Budget phase by phase rather than for the whole programme at once. The modernization assessment takes two to four weeks and ends with a sequenced plan and an estimate per slice. After that, work runs at €45–65 per engineer-hour or with a dedicated squad from €15k per month, and you can pause between slices without losing what is already in production.
Tell us what you need to build or scale. You will get a proposal and estimate within 24 hours.